Categories
Construction Hardscaping Maintenance Parks and Reserves Property Estates

Melbourne Business Park

Projects

Melbourne Business Park

Location

Melbourne

Service Used

Landscape Construction, Wetlands

Client

Stockland

Australian Ecosystems (AE) constructed the landscape for a major wetland and waterway project at Stockland’s Melbourne Business Park in Melbourne’s west. The project brings together the Regen Group’s capabilities in seed collection, plant production, landscape construction, planting and environmental management.

Regen Nurseries collected seed and propagated several hundred thousand plants for the project, using recycled water at Melbourne Water’s Eastern Treatment Plant. Following AE’s landscape construction works, Regen Planters installed more than 220,000 plants and 400 trees. Regen Environmental Management is maintaining the site through establishment, ahead of its eventual handover to Melbourne Water for long-term management.

The landscape is establishing strongly, with plant survival above 95% and weed cover below 2%. These results demonstrate the value of coordinating plant production, construction, planting and maintenance from the outset, particularly across a large and complex environmental landscape.

The constructed wetlands and waterways form an important part of the estate’s stormwater infrastructure, helping capture sediment and remove pollutants and excess nutrients before water flows into downstream waterways. Alongside this function, the landscape provides habitat for birds, frogs, insects and aquatic life, bringing biodiversity into an expanding industrial precinct.

As the landscape matures, it will create a greener setting for the businesses and people who work at Melbourne Business Park, demonstrating how environmental infrastructure can support water management, habitat and everyday connections with nature.

Scope of Construction Works:

  • Landscape construction for the wetland and waterway project

  • Seed collection and propagation through Regen Nurseries

  • Installation of more than 220,000 plants and 400 trees by Regen Planters

  • Coordination across construction, plant supply and planting teams

Scope of Maintenance Works:

  • Landscape establishment and maintenance

  • Weed control

  • Monitoring of plant survival and weed cover

  • Site management through to handover to Melbourne Water

Categories
Construction Hardscaping Maintenance Parks and Reserves Property Estates

Mernda Rail Extension

Projects

Mernda Rail Extension

Location

Melbourne’s northern suburbs, Victoria

Service Used

Landscape construction, tree and understorey planting, topsoil placement, mulching, hydroseeding and landscape establishment and maintenance.

Client

John Holland

Australian Ecosystems (AE) delivered landscaping across three station precincts and two rail corridors as part of the Mernda Rail Extension, bringing large-scale landscape construction and planting capability to a major transport infrastructure project.

The works included the installation of more than 40,000 trees and 111,000 shrubs and groundcovers, together with topsoil placement, mulching and hydroseeding. Delivered across multiple locations, the landscaping created greener settings around the station precincts and along the connecting rail corridors.

Following construction, AE was awarded a maintenance contract to support the establishment and ongoing management of the new landscapes. This provided continuity beyond installation, helping the planting establish as the rail extension became part of the surrounding communities.

The project demonstrates the team’s capacity to deliver and maintain landscapes at scale within complex infrastructure settings. It also reflects the experience now brought together within Regen Environmental Management, connecting landscape construction with the care needed for successful establishment and long-term performance.

Scope of Construction Works:

  • Landscaping across three station precincts and two rail corridors

  • Installation of more than 40,000 trees

  • Planting of 111,000 shrubs and groundcovers

  • Topsoil placement

  • Mulching

  • Hydroseeding

Scope of Maintenance Works:

  • Landscape maintenance contract following construction

  • Establishment and management of planting across the station precincts and rail corridors

Categories
Construction Hardscaping Maintenance Parks and Reserves Property Estates

Carboon Park

Projects

Carboon Park

Location

Riverwalk - Carnboon Park, Werribee

Service Used

Landscape Construction, Parks & Playground, Public Open Space

Client

Development Victoria

Australian Ecosystems (AE) was engaged by Development Victoria as principal landscape contractor for the delivery of Carnboon Park at Riverwalk in Werribee.

Delivered across four stages, the project brought together a broad range of landscape construction works, including playgrounds, shelters, seating and BBQ facilities, concrete pathways, extensive rockwork and indigenous planting. AE’s involvement across the full program provided continuity as each stage of the surrounding residential precincts was delivered.

Carnboon Park covers more than 8,500 m² and has been designed as an important open space for the growing Riverwalk community, incorporating an adventure play area and space for recreation, gathering and outdoor activity.

The project is a good example of Australian Ecosystems’ broad landscape construction capability, bringing together hardscape, structures, play, planting and public open space within a single project. Working closely with Development Victoria and Outlines Landscape Architecture, the team delivered the landscape elements as an integrated package rather than as separate scopes.

Today, Carnboon Park provides Riverwalk residents with a substantial new area of public open space at the heart of the neighbourhood.

Scope of Construction Works:

  • Playground and play-space construction
  • Shelters, seating and BBQ facilities
  • Concrete pathways and paving
  • Extensive rockwork
  • Landscape and indigenous planting
  • Public open space construction
  • Integration with the surrounding residential precincts

Scope of Maintenance Works:

  • Weed control
  • Plant establishment
  • Turf maintenance
  • Rubbish removal
  • Tree maintenance
  • Mulching
  • Pest control and management
  • Plant replacement
  • Playground maintenance
Categories
Parks and Reserves

Galvin Park

Projects

Galvin Park

Location

Werribee

Service Used

Maintenance & Landscaping Services

Categories
Parks and Reserves

Fraser St Reserve

Projects

Fraser St Reserve

Location

Melton South

Service Used

Landscape Construction & Maintenance

Categories
Construction Ecological Restoration

Haining Farm

Projects

Haining Farm

Location

Don Valley

Service Used

Ecosystem Management & Landscaping

The Warralily Estate wetlands and creekline restoration project at Connewarre stretches across several kilometres of Armstrong Creek between Barwon Heads and Geelong. The project involved seed collection, propagation and planting of more than 1 million locally indigenous plants, as well as installing hectares of mulch, jutemat and rockwork, habitat stags, and over a kilometre of concrete pathway and street furniture.

​The Landscaping Victoria judges panel described the Connewarre project as “a major environmental project that is immaculately detailed, making it a community success – a beautiful place for walking, playing and enjoying the outdoors for humans, and through natural rock placement and the use of tree stags as habitat areas, a sanctuary for wildlife too.”

This landscape construction project brought together elements of sustainability, plant selection and water usage to build a beautiful wetland which interacts harmoniously on all levels and enhances the natural environment. The project also won Landscaping Victoria awards for Use of Plants in the Landscape, Landscape Management and Maintenance and the Natural Built Environment.

​Site Specs: 42 hectares of conservation area
Constructed wetlands
17 hectares of open woodland grazing

Categories
Construction Wetlands and Creeks

Aquarevo Estate

Projects

Aquarevo Estate

Location

Lyndhurst

Service Used

Wetland Construction & Landscape Maintenance

Architect

Spiire

Client

Villawood Properties

This open space and wetland construction project was completed by Australian Ecosystems (AE) for Villawood Properties at the new Aquarevo Estate in Lyndhurst. It demonstrates Australian Ecosystem’s attention to detail, ecological sensitivity and expertise in the construction of stormwater treatment wetlands. The project was designed to intercept, retain and treat large volumes of stormwater from the estate and surrounding areas, to filter out pollutants and improve water quality. The wetland delivers additional benefits including urban cooling, habitat for local wildlife, and public amenity.

Australian Ecosystems supplied and installed topsoil, mulch and over 11,000m2 of jute matting. We collected seed, supplied and installed over 400 shrubs and ground cover plants, more than 300 advanced trees and over 110,000 aquatic plants for the wetland. We were also contracted to maintain the wetland complex for 2 years, in readiness to hand over the asset to Melbourne Water at the end of the maintenance period.

To ensure compliance with Melbourne Water’s Wetland Design Manual, all shallow, deep and submerged marsh species were grown and supplied in 600cc plant formats, and all ephemeral plants were supplied in 93cc hiko cells or tubestock. The results have been outstanding with the site being awarded PC by Melbourne Water without defect. The site is currently being maintained by Australian Ecosystems, with under 5% weed cover and over 95% survival rates of all plantings. The site is now a thriving ecosystem and a beautiful space to visit. 

Scope of Works:

  • Site preparation
  • Supply and install of topsoil and mulch
  • Supply and install of +11,000m2 of jute mat
  • Supply and install of +400 shrubs and ground cover plants (150mm pots)
  • Supply and install of +300 semi-advanced trees (300mm pots)
    Supply and install of +70,000 tubestock, +27,000 Hiko and +11,000 600cc aquatic plants for the wetland zone
  • 2 year maintenance contract
Categories
Construction Wetlands and Creeks

Lollypop Creek

Projects

Lollypop Creek

Location

Werribee

Service Used

Landscape Construction & Maintenance

Architect

Spiire

Client

Werribee Project Pty Ltd

Lollipop Creek Section 14 was completed by Australian Ecosystems (AE) for Werribee Project Pty Ltd at Kings Leigh Estate in Werribee. This landscape construction project is a beautiful creekline and nature corridor that provides ecological services including water treatment and habitat creation as well as mitigating urban heat island effect. It has become a community asset with local residents able to walk along the creek and enjoy the influx of nature into the new estate.

Following the design from Spiire, AE conducted significant formal landscaping works including the supply and install of concrete paving, seating, picnic tables, bollards as well as a fence for vehicle exclusion. Australian Ecosystems supplied and installed more than 250 trees which were inspected by a qualified arborist to guarantee the quality of the tree stock. Australian Ecosystems conducted seed collection for the project and supplied and installed plants for the ornamental beds, the creekzone and the bioretention pools.

To ensure compliance with Melbourne Water’s Wetland Design Manual, all shallow, deep and submerged marsh species were grown and supplied in 600cc plant formats, and all ephemeral plants were supplied in 93cc hiko cells or tubestock. The results have been outstanding with the site being awarded PC by Melbourne Water without defect.

The site is currently being maintained by Australian Ecosystems, with under 5% weed cover and over 95% survival rates of all plantings. The landscape is teaming with life, providing habitat for a variety of bird species, frogs, insects and more.

Scope of Works:

  • Supply and install of exposed aggregate concrete paving
  • Supply and install of public furniture including seating, picnic tables and platform benches
  • Supply and install of vehicle exclusion fencing
  • Supply and install of +250 trees with follow-up arboriculture assessment 
  • Edging, Grassing and Bollard installation
  • Supply and Install of +90,000 (HIKO format) tubestock plants for creekzone planting
  • Supply and install of +800 (600CC format) aquatic plants
  • Supply and install of +5000 plants (150mm pots) for ornamental garden beds
  • 2 year maintenance period
Categories
Construction Maintenance Wetlands and Creeks

Upper Point Cook

Projects

Upper Point Cook

Location

Point Cook

Service Used

Landscape Construction & Maintenance

Architect

Spiire

Client

Satterley Property Group

The Upper Point Cook Estate Project was completed by Australian Ecosystems (AE) for Satterley Property Group at Point Cook. AE’s work on the estate comprised of two seperate projects. The first was a large parkland reserve and constructed stormwater treatment wetland, which was designed to intercept, retain and treat large volumes of stormwater from the estate and surrounding areas, and to filter out pollutants and improve water quality. The wetland delivers additional benefits including urban cooling, habitat for local wildlife, and public amenity.

This project also involved extensive formal landscaping works such as paving, edging, rockwork as well as the supply and installation of outdoor furniture and a playground. After the success of the first project we were contracted to construct an adjacent wetland with a similar scope of works. In total, Australian Ecosystems supplied and installed 76,000 aquatic and ephemeral plants, over 9,600 plants and trees for the surround landscape and garden bed, 3330m2 of instant kikuyu turf and an irrigation system for the gardens beds.

To ensure compliance with Melbourne Water’s Wetland Design Manual, all shallow, deep and submerged marsh species were grown and supplied in 600cc plant formats, and all ephemeral plants were supplied in 93cc hiko cells or tubestock. The results have been outstanding with the site being awarded PC by Melbourne Water without defect. We received a 2 year contract for maintenance services. The site has under 5% weed cover and over 95% survival rates of all plantings. The site is now a thriving ecosystem and a beautiful public amenity for the Point Cook Community.

Scope of Works:

  • Site preparation and weed control
  • Supply and Installation of over 76,000 aquatic and ephemeral plants for the constructed wetlands
  • Supply and install of over 9,500 assorted plants and trees for the surrounding landscape and garden beds
  • Supply and install of over 3330m2 of Instant Kikuyu Turf
  • Paving, edging, rock work
  • Supply and install free standing concrete walls and basalt rock boulders
  • Supply and install of outdoor furniture and playground
  • Design, supply and install of irrigation system for all garden beds
  • 2 year maintenance period
Categories
Ecological Restoration Maintenance

Highlands Estate

Projects

Highlands Estate

Location

Craigieburn

Service Used

Landscape Maintenance

Client

Stockland

Superintendant

Thompson Berrill Landscape Design

Between 2009 and 2019 Australian Ecosystems undertook ecological management at the Golden Sun Moth Conservation Site in Highlands Estate, Craigieburn. The 44 hectare site supports endangered flora including Matted Flax Lily (Dianella Amoena) and River Swamp Wallaby-Grass (Amphibromus Fluitans) as well as Red River Gums thought to be over 300 years old!

Scope of Works:

  • Biomass Reduction
  • Landscape Maintenance
  • Weed Control
  • General Maintenance
  • Flora Mapping
  • Reporting