Projects

Edgars Creek

Location

Wollert

Service Used

Landscape Construction & Maintenance

Architect

Spiire

Client

Lendlease

Australian Ecosystems (AE) constructed several sections of Edgars Creek for Lendlease. The project demonstrates AE’s expertise in landscape construction and ecological services, particularly in the area of water treatment, as well as our skill and attention to detail with formal landscaping works.

Following the design from Spiire, AE conducted minor earthworks which involved grading, drainage works and rock removal where necessary. AE also supplied and installed steel fixed bollards, a vehicle exclusion fence, paving, dry stone walls, public furniture, fitness equipment as well as a pedestrian bridge.

The creekline aspect of the project involved the propagation, supply and installation of plants locally indigenous to the basalt plains for the terrestrial zones, the creekline zones and the bioretention treatment ponds. These ponds were designed to filter pollutants and improve stormwater quality as it flows down Edgars Creek. The creekline has additional benefits including urban cooling, habitat for local wildlife, and public amenity.

To ensure compliance with Melbourne Water’s Wetland Design Manual, all shallow, deep and submerged marsh species were grown and supplied in 600cc plant formats, and all ephemeral plants were supplied in 93cc hiko cells or tubestock. The outcome speaks for itself with the site being awarded PC by Melbourne Water without defect. AE received a 2 year contract for maintenance services and the site is now a thriving ecosystem and a beautiful parkland reserve for the Wollert Community. 

Scope of Works: 

  • Minor Earthworks (Grading, drainage and rock removal)
  • Supply and install of steel fixed bollards, paving and vehicle exclusion fence
  • Supply and install of dry stone wall, public furniture, fitness equipment and pedetrian bridge
  • Supply and install of +3000m2 of hydroseed mulch
  • Supply and install of +300 trees for tree reserve (+ arbocultural assessment)
  • Supply and install of +130,000 tubestock plants for creek channel zone
  • Supply and install of +1,900 tubestock and +1,700 600cc plants for water treatment assets
  • Supply and install of +9000 shrubs and ground cover plants (150mm pots) 
  • 2 year maintenance contract